New rear garden scheme in Epping Forest – week 3

New rear garden scheme in Epping Forest – week 3

Week 3 – The Natural Sandstone flags are starting to for the new terrace area, here you can see we have designed the flag pattern to be laid with a 30cm wide picture frame and 60cm wide random linear infill, running perpendicular from the house. Next week we hope to complete the flag laying within…

Cuffley driveway and front garden scheme is complete

Cuffley driveway and front garden scheme is complete

Cuffley front garden & driveway scheme is complete. After several weeks waiting for the April/May rain showers to pass, we finally had the weather window to surface the driveway and fit the automated gate system. Keep an eye on our Design & Build Project Gallery, as we will feature this example of a modern design…

Closeboard boundary fencing at Enfield

Closeboard boundary fencing at Enfield

The boundary fencing has been erected at Enfield this week, 208 linear metres. The Oakleigh Manor post auger made short work of the post holes, every post hole was augered to a depth of 60cm, approx 10 seconds per hole, our team were very pleased with that. Now the rest of the garden can really…

New project at Epping Forest, Essex

New project at Epping Forest, Essex

A new 380m2 Natural Sandstone terrace is going to keep this team busy for the next 6 weeks, then 66m of cast stone balustrade will be fitted around the outer edge. This end of the terrace is being excavated today down to formation level, the sand based subsoil will be used to fill the other…

New Iroko hardwood Auto Gates and piers at Rusper

New Iroko hardwood Auto Gates and piers at Rusper

The gates and pier caps were fitted this week to complete the hardware on this entrance configuration. The piers really look good with the weatherstuck pointing and cast stone detailed pier caps. The automation system communicates with the house via a video phone, keypad coded access, remote control fobs and a vehicle detection loop on…

Swimming Pool Project in North London takes shape

Swimming Pool Project in North London takes shape

Rob, the pool tiler is very happy today, weve covered the entire pool with a huge taurpalin to form a temporary rain proof working environment, much needed as it has rained every day for the last 15 days. The walls are tiled and the Pool cover track rails and underground pit are installed. The inwall…