Garden Design & Build project update – Lenham

Thoughts and musings

Garden Design & Build project update – Lenham

Admin | October 26, 2012 | 0 Comments

Thankfully no waterproofs have been needed for a week! The hard landscaping is really starting to get going. The walls have had an initial coat of render and the client is choosing the top coat colour. The sawn stone is starting to take shape and looking stunning. The step treads have been cut, bull nosed on site and are installed to create a smooth transition from the main terrrace to the second level.