The project is certainly coming along with some hard work and dry weather! The concrete base formation for the Ivory sandstone terrace is in place, The topsoil for the main lawn and conditioned soil for the borders has been moved in. The four Topiary Photinia half standard’s have been planted along the lawn edge and the new Steel frame for the lawn has been installed and ral painted to match the existing sun room window frames. The irrigation ring main has been installed along with the electric cabling for the lighting system. This week will see the Ivory sandstone paving installed, The ral colour matched aluminium pergola, The new lawn, IPE hardwood timber cladding installed and the resin bound paving surfaces completed.