After an extremely testing start to the week with the snow we have now made some progress to the front of the house.
The ground work for the resin bound gravel driveway is almost complete and the ground work for the rear granite terrace is complete.
The foundation footing for the block work rendered wall is in place and with rising temperatures we will be able to start some Landscape construction.
The new drainage pipework has been installed and connected to a main soak away to the front of the house.
The Granite curbs have been set into place along the boundary of the driveway and this week we shall start to lay the granite edgings to frame the resin bound drive.